Groundbreaking ceremony kicks off today for Charlotte Street Foundation

A groundbreaking ceremony will kick off at 5pm today to celebrate the soon-to-be start of construction for Charlotte Street Foundation’s new campus, located near Roanoke Park.

Charlotte Street Foundation was established in 1997 in response to a lack of creative, social and economic resources for Kansas City artists. The organization has steadily expanded its suite of services to include special commissions, free studio residencies, exhibition and performance space for artists, and advocacy with local and national philanthropic business and civic leaders. Charlotte Street is also the only organization in the region that grants artists direct monetary support.

The new campus – a two-building industrial complex – is located at 3333 Wyoming Street and will offer nearly 25,000 SF of operating space. Charlotte Street’s relocation will repurpose the closed, segregated buildings into a flexible, open, community-focused hub of activity.

The building concept starts with the idea of an artist’s village. Hufft, who leads the design, focused on connections: artists to other artists; artists to the greater community; artists to the Charlotte Street staff; and artists to the surrounding landscape.

The building opens up both vertically and horizontally, starting with inserting a main reception that connects the lower and upper terraces. As the new collective entrance to the building it ensures that everyone passes through the same space regardless of how they access the hilly site. It serves as a lobby, an incubator, a lecture hall with large cascading staircase, and the first space for a chance interaction. From here the building opens up vertically, so that from the reception you can see up to the artist’s studio levels, forming the next level of community interaction.

The final step is the insertion of large openings into the windowless industrial building, providing a glimpse to the outside and connecting the artists to both the surrounding community and lush landscape. The result is a continuous internal village streetscape, where artists step outside their studio to find themselves in an active continuous space, one that connects down to the reception, artist’s courtyard, and beyond.

The foundation moved its offices to the new campus in October and continues to operate their 2019 programming out of various metro area locations. With construction kicking off this summer, current project schedules have the transition of resources to the campus taking place in the first quarter of 2020.

Hufft leads the design along with the project team of Benson Method, who serves as the Owner Representative. Newkirk Novak is the general contractor, 40North is the landscape architect, and engineering support for the project is provided by Lankford Fendler as MEP.

The Charlotte Street Foundation Groundbreaking Ceremony is today, June 12 starting at 5pm at 3325-3335 Wyoming Street. There will be a guided tour and feature artists performing throughout the event.